Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/ATP -
Message number: 292
Message text: Period &1 of product allocation group is not defined in the planning area
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP292
- Period &1 of product allocation group is not defined in the planning area ?The SAP error message
/SAPAPO/ATP292
indicates that a specific period for a product allocation group is not defined in the planning area. This error typically arises in the context of Advanced Planning and Optimization (APO) when trying to perform an allocation check or when executing a planning run that involves product allocations.Cause:
- Missing Period Definition: The specified period (e.g., week, month) for the product allocation group is not defined in the planning area.
- Incorrect Configuration: The planning area may not be properly configured to include the necessary periods for the product allocation group.
- Data Inconsistency: There may be inconsistencies in the master data or configuration settings related to the product allocation group.
Solution:
Check Planning Area Configuration:
- Go to the planning area configuration in SAP APO.
- Verify that the period in question is defined for the product allocation group.
- If it is missing, you may need to add the period to the planning area.
Define the Period:
- If the period is not defined, you can define it by navigating to the relevant configuration settings in the SAP APO system.
- Ensure that the time bucket settings include the required periods for the product allocation group.
Review Product Allocation Group Settings:
- Check the settings for the product allocation group to ensure that it is correctly set up and linked to the appropriate planning area.
- Make sure that the allocation group is active and that the periods are correctly assigned.
Data Consistency Check:
- Perform a consistency check on the master data related to the product allocation group and the planning area.
- Ensure that all relevant data is correctly maintained and that there are no discrepancies.
Consult Documentation:
- Refer to SAP documentation or help resources for detailed steps on configuring planning areas and product allocation groups.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC62
(for product allocation) to check and maintain settings.By following these steps, you should be able to resolve the error and ensure that the necessary periods are defined for the product allocation group in the planning area.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/ATP291
Copying confirmations from temporary qty assignments is not permitted
What causes this issue? Simultaneously copying the confirmation from the temorary quantity assignment (CHKIND &v1&) and the check results dis...
/SAPAPO/ATP290
An error occurred when transferring characteristics combinations
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP293
A connection has not been defined for the product allocation group
What causes this issue? The <DS:DE./SAPAPO/KCGRP>product allocation group</> can be connected to a <DS:TX./SAPAPO/PLANUNGSBEREICH>p...
/SAPAPO/ATP294
Fiscal year variant &1 has not been defined
What causes this issue? Fiscal year variant &v1& has not been defined.System Response The system issues an error message and will not allow ...
Click on this link to search all SAP messages.