Message type: E = Error
Message class: /SAPAPO/ATP -
Message number: 259
Message text: Transferred time contains more than 999 periods
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP259
- Transferred time contains more than 999 periods ?The SAP error message /SAPAPO/ATP259 indicates that the transferred time for a certain operation or process exceeds the maximum limit of 999 periods. This error typically occurs in the context of Advanced Planning and Optimization (APO) when dealing with time-based data, such as in the context of Available-to-Promise (ATP) checks or planning scenarios.
Cause: Excessive Time Periods: The primary cause of this error is that the system is trying to process a time frame that includes more than 999 periods. This could happen if the planning horizon is set too wide or if there are too many time buckets defined in the planning settings.
Configuration Issues: Incorrect configuration in the planning settings or master data can lead to the system attempting to process an excessive number of periods. Data Input Errors: Sometimes, the error can be triggered by incorrect data inputs or settings in the transaction or planning run.
Solution: Adjust Planning Horizon: Review and adjust
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/ATP258
Connection to planning area &1, version &2 (period &3, &4) defined
What causes this issue? A connection between the <DS:DE./SAPAPO/KCGRP>product allocation group </> and <DS:DE./SAPAPO/TS_PAREAID>pl...
/SAPAPO/ATP257
Connection to InfoCube &1, version &2 (period &3, &4) defined
What causes this issue? A connection between the <DS:DE./SAPAPO/KCGRP>product allocation group </> and the <DS:DE./SAPAPO/INFOCUBE>...
/SAPAPO/ATP260
Temporary quantity assignment could not be determined in liveCache &1
What causes this issue? The temporary quantity assignment could not be determined from liveCache using connection &v1&. The export of the tem...
/SAPAPO/ATP261
Temporary quantity assignment could not be saved in liveCache &1
What causes this issue? The temporary quantity assignment could not be written to liveCache using the connection &v1&. The writing of the tem...
Click on this link to search all SAP messages.