Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/ATP -
Message number: 233
Message text: End date specified already being used
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP233
- End date specified already being used ?The SAP error message
/SAPAPO/ATP233
indicates that the end date specified for a certain operation or activity is already being used in another context within the Advanced Planning and Optimization (APO) module. This typically occurs in scenarios involving availability checks, production planning, or scheduling where overlapping dates are not allowed.Cause:
- Overlapping Dates: The end date you are trying to use is already assigned to another activity or order, leading to a conflict.
- Data Integrity Issues: There may be inconsistencies in the data, such as duplicate entries or incorrect date assignments.
- Configuration Settings: Certain settings in the APO system may restrict the use of overlapping dates for specific processes.
Solution:
- Check Existing Entries: Review the existing activities or orders that are using the specified end date. You can do this by querying the relevant tables or using transaction codes that allow you to view the scheduling or planning data.
- Adjust Dates: If possible, modify the end date of the conflicting entry or the new entry you are trying to create to ensure there are no overlaps.
- Data Cleanup: If you find duplicate or erroneous entries, consider cleaning up the data to resolve conflicts.
- Consult Configuration: Review the configuration settings in the APO system to see if there are any restrictions on date usage that need to be adjusted.
- Use Transaction Codes: Utilize transaction codes like
/SAPAPO/ATC
(for checking ATP) or/SAPAPO/SDP94
(for planning board) to analyze and troubleshoot the issue further.Related Information:
If the problem persists after trying the above solutions, it may be beneficial to involve your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/ATP232
Enter account assignment object
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP231
Enter special stock indicator
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP234
Product allocation group &1 has been locked by user &2
What causes this issue? Product allocation group &v1& cannot be locked because it has been locked by another user (&v2&).System Respo...
/SAPAPO/ATP235
No general collective product allocations exist
What causes this issue? No general collective product allocations exist for the current characteristics combination. No additional characteristic val...
Click on this link to search all SAP messages.