Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/ATP -
Message number: 219
Message text: Start date lies after end date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP219
- Start date lies after end date ?The SAP error message
/SAPAPO/ATP219
indicates that there is a problem with the date range specified in the Advanced Planning and Optimization (APO) system. Specifically, it means that the start date for a certain operation or planning activity is set to a date that is later than the end date, which is logically incorrect.Cause:
- Incorrect Date Entry: The most common cause is that the user has entered the start date and end date incorrectly, leading to a situation where the start date is after the end date.
- Data Migration Issues: If data has been migrated from another system, there may be inconsistencies in the date formats or values.
- Configuration Errors: There may be issues in the configuration of the planning parameters or settings that lead to incorrect date calculations.
- Master Data Issues: Problems with the master data (like product availability, production scheduling, etc.) can also lead to this error.
Solution:
- Check Date Entries: Review the start and end dates in the relevant transaction or planning activity. Ensure that the start date is earlier than the end date.
- Correct Data: If the dates are incorrect, update them to reflect the correct timeline.
- Review Planning Parameters: Check the planning parameters and settings in the APO system to ensure they are configured correctly.
- Validate Master Data: Ensure that the master data related to the products, resources, or any other relevant entities is accurate and up-to-date.
- Test Changes: After making corrections, test the changes to ensure that the error does not reoccur.
Related Information:
/SAPAPO/ATPL
(for ATP checks) or /SAPAPO/SDP94
(for planning board) to access the relevant data.By addressing the root cause of the date discrepancy, you should be able to resolve the error and proceed with your planning activities in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/ATP218
Error during scheduling in product allocation
What causes this issue? An error occurred in scheduling when converting the date in product allocations (for example, from the product availability d...
/SAPAPO/ATP217
No valid rows chosen in the table
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP220
Product of item &2 not allocated
What causes this issue? Product allocation has not been carried out since no <DS:GLOS.36C041B641AF05B9E10000009B38F983>product allocation proce...
/SAPAPO/ATP221
Product not allocated
What causes this issue? A product allocations procedure has not been entered for the product. Product allocations was therefore not carried out. Prod...
Click on this link to search all SAP messages.