How To Fix /SAPAPO/AMON_LIST023 - Receipt due date/time violated by &TDIFF h (dynamic pegging)


/SAPAPO/AMON_LIST023 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/AMON_LIST -

  • Message number: 023

  • Message text: Receipt due date/time violated by &TDIFF h (dynamic pegging)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/AMON_LIST023 - Receipt due date/time violated by &TDIFF h (dynamic pegging) ?
    The SAP error message /SAPAPO/AMON_LIST023 indicates that there is a violation of the receipt due date/time in the context of dynamic pegging within the Advanced Planning and Optimization (APO) module. This typically occurs when the planned receipt for a product is scheduled to arrive later than the required date/time for the demand it is supposed to fulfill.
    
    Cause: Dynamic Pegging Issues: The error is often related to dynamic pegging, which is a method used in SAP APO to link supply and demand. If the planned receipt is not aligned with the demand due date, it can lead to this error. Lead Time Delays: If there are delays in production or transportation lead times, the receipt may not arrive on time. Incorrect Planning Parameters: The planning parameters such as safety stock, reorder points, or lead times may not be set correctly, leading to scheduling issues. Capacity Constraints: If there are capacity constraints in production or transportation,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker