How To Fix /SAPAPO/AMON_ALERTS053 - Resource overload (multi activity)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/AMON_ALERTS -

  • Message number: 053

  • Message text: Resource overload (multi activity)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/AMON_ALERTS053 - Resource overload (multi activity) ?

    The SAP error message /SAPAPO/AMON_ALERTS053 Resource overload (multi activity) typically occurs in the Advanced Planning and Optimization (APO) module of SAP when there is a resource overload due to multiple activities scheduled for a resource that exceeds its capacity. This can happen in scenarios where production or planning activities are scheduled to occur simultaneously on a resource that cannot handle the load.

    Cause:

    1. Resource Capacity Limitations: The resource has a defined capacity, and the planned activities exceed this capacity.
    2. Scheduling Conflicts: Multiple activities are scheduled at the same time, leading to conflicts.
    3. Incorrect Master Data: The resource's capacity or availability might not be correctly defined in the master data.
    4. Planning Parameters: The planning parameters set for the resource may not align with the actual production capabilities.

    Solution:

    1. Review Resource Capacity: Check the capacity settings for the resource in the APO system. Ensure that the capacity is defined correctly and reflects the actual capabilities of the resource.
    2. Adjust Planning Parameters: Modify the planning parameters to better align with the resource's capabilities. This may include adjusting the planning horizon, lead times, or other relevant settings.
    3. Reschedule Activities: If possible, reschedule the conflicting activities to different time slots to avoid overload.
    4. Optimize Resource Utilization: Consider optimizing the utilization of resources by balancing the load across multiple resources or by adjusting the production schedule.
    5. Check Master Data: Ensure that the master data for the resource is accurate, including capacity, availability, and any constraints that may affect scheduling.
    6. Use Capacity Planning Tools: Utilize SAP's capacity planning tools to analyze and visualize resource utilization and identify potential overloads before they occur.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SAPAPO/AMON to access alert monitoring and analyze the specific alerts related to resource overload.
    • APO Configuration: Familiarize yourself with the configuration settings in APO related to resource planning and capacity management.
    • Documentation: Refer to SAP Help documentation for detailed information on resource planning and capacity management in APO.
    • Support: If the issue persists, consider reaching out to SAP support or consulting with an SAP APO expert for further assistance.

    By addressing the underlying causes and implementing the suggested solutions, you can resolve the resource overload issue and improve the efficiency of your planning processes in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker