How To Fix /SAPAPO/AMON_ALERTS053 - Resource overload (multi activity)


/SAPAPO/AMON_ALERTS053 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/AMON_ALERTS -

  • Message number: 053

  • Message text: Resource overload (multi activity)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/AMON_ALERTS053 - Resource overload (multi activity) ?
    The SAP error message /SAPAPO/AMON_ALERTS053 Resource overload (multi activity) typically occurs in the Advanced Planning and Optimization (APO) module of SAP when there is a resource overload due to multiple activities scheduled for a resource that exceeds its capacity. This can happen in scenarios where production or planning activities are scheduled to occur simultaneously on a resource that cannot handle the load.
    
    Cause: Resource Capacity Limitations: The resource has a defined capacity, and the planned activities exceed this capacity. Scheduling Conflicts: Multiple activities are scheduled at the same time, leading to conflicts. Incorrect Master Data: The resource's capacity or availability might not be correctly defined in the master data. Planning Parameters: The planning parameters set for the resource may not align with the actual production capabilities.
    Solution: Review Resource Capacity: Check the capacity settings for the resource in the APO system. Ensure that the capacity is defined correctly and reflects the actual capabilities of the resource. Adjust Planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author