How To Fix /SAPAPO/AMON_ALERTS006 - Receipt due date/time violated (dynamic pegging)


/SAPAPO/AMON_ALERTS006 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/AMON_ALERTS -

  • Message number: 006

  • Message text: Receipt due date/time violated (dynamic pegging)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/AMON_ALERTS006 - Receipt due date/time violated (dynamic pegging) ?
    The SAP error message /SAPAPO/AMON_ALERTS006 indicates that there is a violation of the receipt due date/time in the context of dynamic pegging within the Advanced Planning and Optimization (APO) module. This typically occurs when the planned receipt of materials does not align with the required delivery dates for the demand, leading to potential supply shortages or delays.
    
    Cause: Dynamic Pegging Issues: The dynamic pegging mechanism in SAP APO is designed to link supply and demand. If the planned receipt date of a supply does not meet the required date of the demand, this error will be triggered. Incorrect Planning Parameters: The planning parameters such as lead times, safety stock levels, or production schedules may not be set correctly, leading to discrepancies in the planned receipt dates. Changes in Demand or Supply: Sudden changes in demand (e.g., increased orders) or supply (e.g., delays in production or delivery) can cause the planned receipts to fall out

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant