Do you have any question about this error?
Message type: E = Error
Message class: S2L - Production Supply: General Messages
Message number: 509
Message text: Planning horizon lies in the past
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
S2L509
- Planning horizon lies in the past ?The SAP error message S2L509, which states "Planning horizon lies in the past," typically occurs in the context of planning and forecasting within SAP systems, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). This error indicates that the planning horizon you are trying to use for your planning activities is set to a date that is earlier than the current date.
Cause:
- Incorrect Planning Horizon Settings: The planning horizon may have been configured incorrectly, leading to a situation where the start date of the planning horizon is in the past.
- Data Entry Errors: Users may have inadvertently entered a past date when defining the planning horizon.
- System Date Issues: The system date may not be correctly set, leading to confusion about what constitutes the "current" date.
Solution:
Check Planning Horizon Settings:
- Navigate to the relevant configuration settings in your SAP system where the planning horizon is defined.
- Ensure that the start date of the planning horizon is set to a date that is equal to or later than the current date.
Adjust the Planning Parameters:
- If you are using a planning book or a specific planning view, check the parameters and ensure they are correctly set to reflect the desired planning period.
Update System Date:
- Verify that the system date is correct. If the system date is incorrect, it may need to be adjusted by your system administrator.
User Training:
- Ensure that users are trained on how to set the planning horizon correctly to avoid future errors.
Consult Documentation:
- Refer to the SAP documentation or help files for specific instructions on how to configure the planning horizon in your version of SAP.
Related Information:
/SAPAPO/SDP94
for SAP APO).By following these steps, you should be able to resolve the S2L509 error and ensure that your planning horizon is set correctly for your planning activities.
Get instant SAP help. Start your 7-day free trial now.
S2L508
No log saved if no validity period maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
S2L507
No replenishment proposals are generated
What causes this issue? You have selected both the control parameter <LS>Generate replenishment proposals</> and the control parameter &l...
S2L600
---- Up to 649 reserved for APO Interface ----
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
S2L602
Requirements cannot be determined for APO System &1
What causes this issue? The logical system &v1& is an APO Release &v2&. The combination of APO release &v2& and this ERP Rele...
Click on this link to search all SAP messages.