Do you have any question about this error?
Message type: E = Error
Message class: RU - Messages for order completion confirmation
Message number: 249
Message text: Check degree of processing and remaining work.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RU249
- Check degree of processing and remaining work. ?The SAP error message RU249 "Check degree of processing and remaining work" typically occurs in the context of production planning and control, particularly when dealing with production orders, process orders, or similar transactions. This message indicates that there is a discrepancy between the expected processing of a production order and the actual work that has been completed or is still pending.
Causes:
- Incomplete Processing: The production order may not have been fully processed, meaning that some operations or steps are still pending.
- Incorrect Status: The status of the production order may not reflect the actual work done. For example, it might be set to "in process" when it should be "completed."
- Data Inconsistencies: There may be inconsistencies in the data related to the production order, such as missing confirmations or incorrect quantities.
- System Errors: Occasionally, system errors or bugs can lead to this message being triggered.
Solutions:
- Check Order Status: Review the status of the production order in question. Ensure that all necessary operations have been completed and confirmed.
- Confirm Operations: If there are operations that have not been confirmed, make sure to confirm them in the system. This can often resolve discrepancies.
- Review Remaining Work: Use transaction codes like CO03 (Display Production Order) to check the remaining work and the degree of processing. Ensure that the data aligns with what has been physically completed.
- Reprocess the Order: If there are issues with the order, you may need to reprocess it or make adjustments to the order status.
- Consult Logs: Check system logs for any errors or warnings that might provide additional context for the issue.
- Contact Support: If the issue persists and cannot be resolved through the above steps, consider reaching out to your SAP support team or consulting SAP documentation for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the RU249 error and take appropriate action to resolve it.
Get instant SAP help. Start your 7-day free trial now.
RU248
Enter either degree of processing or set the final confirmation indicator
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RU247
Enter either remaining work or set the final confirmation indicator
What causes this issue? You entered remaining activity for your confirmation and also set the indicator <LS>final confirmation</>. Howeve...
RU250
Actual work + remaining work exceeds planned work
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RU251
Actual duration + remaining duration exceeds planned duration
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.