How To Fix RU190 - Individual cap. &/& is already manually confirmed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RU - Messages for order completion confirmation

  • Message number: 190

  • Message text: Individual cap. &/& is already manually confirmed

  • Show details Hide details
  • What causes this issue?

    The individual capacity was already confirmed (for example, using a
    summary confirmation).

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RU190 - Individual cap. &/& is already manually confirmed ?

    The SAP error message RU190, which states "Individual capacity &/& is already manually confirmed," typically occurs in the context of capacity planning and scheduling in SAP, particularly when dealing with production orders or capacity requirements.

    Cause:

    This error arises when you attempt to confirm a capacity that has already been manually confirmed. In SAP, individual capacities (like work centers or production resources) can only be confirmed once for a specific time period. If a confirmation is attempted again for the same capacity within that time frame, the system will generate this error.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Existing Confirmations:

      • Use transaction codes like CO11N (for confirming production orders) or COHV (for mass processing of confirmations) to check if the capacity has already been confirmed.
      • Review the confirmation history for the specific work center or resource to see if there are overlapping confirmations.
    2. Adjust Confirmations:

      • If you find that the capacity has been confirmed, you may need to adjust or delete the existing confirmation if it is incorrect or no longer needed.
      • Use transaction CO13 to reverse a confirmation if necessary.
    3. Review Scheduling:

      • Ensure that the scheduling of production orders or operations does not overlap in a way that would cause multiple confirmations for the same capacity.
      • Adjust the scheduling parameters or the production order to avoid conflicts.
    4. Consult Documentation:

      • Review SAP documentation or help files related to capacity planning and confirmations for additional insights and best practices.
    5. Contact Support:

      • If the issue persists and you cannot identify the cause, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO11N, COHV, CO13, and CM01 (Capacity Planning).
    • Capacity Planning: Understanding how capacity planning works in SAP can help prevent such errors in the future. This includes knowing how to manage work centers, production resources, and scheduling.
    • SAP Notes: Check for any SAP Notes related to this error message, as they may provide specific patches or updates that address known issues.

    By following these steps, you should be able to resolve the RU190 error and ensure smooth capacity management in your SAP environment.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author