Do you have any question about this error?
Message type: E = Error
Message class: RU - Messages for order completion confirmation
Message number: 031
Message text: Check the new activities for work center & in plant &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RU031
- Check the new activities for work center & in plant & ?The SAP error message RU031 typically indicates that there is an issue with the work center configuration in the system. This error often arises when there are inconsistencies or missing data related to the activities assigned to a work center in a specific plant.
Cause:
- Missing Activities: The work center may not have the necessary activities defined for the operations you are trying to perform.
- Incorrect Configuration: There may be incorrect or incomplete configuration settings for the work center in the plant.
- Plant Assignment Issues: The work center might not be properly assigned to the plant in question.
- Data Inconsistencies: There could be inconsistencies in the master data related to the work center or the plant.
Solution:
Check Work Center Configuration:
- Go to the transaction code
CR01
(Create Work Center) orCR02
(Change Work Center).- Verify that the work center has the necessary activities defined. Ensure that the activities are relevant to the operations you are trying to execute.
Review Plant Assignment:
- Ensure that the work center is correctly assigned to the relevant plant. You can check this in the work center configuration.
Add Missing Activities:
- If you find that certain activities are missing, you can add them in the work center configuration. Make sure to include all necessary activities that are required for production planning and execution.
Check for Data Consistency:
- Run consistency checks for the work center and related master data. You can use transaction codes like
C223
(Check Work Center) to identify any inconsistencies.Consult Documentation:
- Refer to SAP documentation or help files for detailed information on work center configuration and the specific activities required for your business processes.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CR01
, CR02
, CR03
(Display Work Center), and C223
.By following these steps, you should be able to resolve the RU031 error and ensure that your work center is properly configured for the activities required in your plant.
Get instant SAP help. Start your 7-day free trial now.
RU030
Date &, time & is in the future
What causes this issue? You have tried to enter a date/time in the future.System Response The system issues a warning or an error message depending ...
RU029
According to factory calendar & (&) is not a workday (check entry)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RU032
Work center & does not exist in plant & (check your entry)
What causes this issue? The work center that you have entered does not exist in plant &V2&.How to fix this error? There are two options: Ent...
RU033
Confirmed activity must not be smaller than 0 (check entry)
What causes this issue? You have tried to confirm a negative activity or to cancel a confirmation. This results in a negative total confirmed quantit...
Click on this link to search all SAP messages.