Do you have any question about this error?
Message type: E = Error
Message class: RSH_PROJ_ASG - Project Assignment Messages
Message number: 001
Message text: Please enter a start date for the assignment
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RSH_PROJ_ASG001
- Please enter a start date for the assignment ?The SAP error message RSH_PROJ_ASG001 ("Please enter a start date for the assignment") typically occurs in the context of project management or resource assignment within SAP. This error indicates that a required field, specifically the start date for a project assignment, has not been filled in.
Cause:
- Missing Start Date: The most common cause of this error is that the user has not entered a start date for the assignment of a resource to a project.
- Incorrect Data Entry: The date format may not be recognized, or the date entered may be invalid.
- Configuration Issues: There may be configuration settings in the project management module that require a start date but are not properly set up.
Solution:
Enter a Start Date:
- Navigate to the assignment screen where the error occurred.
- Locate the field for the start date and enter a valid date.
- Ensure that the date is in the correct format as per your system settings (e.g., DD/MM/YYYY or MM/DD/YYYY).
Check for Required Fields:
- Ensure that all required fields are filled out correctly. Sometimes, other fields may also need to be completed before the system allows you to save the assignment.
Review Configuration:
- If you have the necessary permissions, check the configuration settings for project assignments in the SAP system to ensure that the start date is set as a required field.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on project assignments and required fields.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By addressing the missing start date and ensuring all required fields are filled out correctly, you should be able to resolve the error message RSH_PROJ_ASG001.
Get instant SAP help. Start your 7-day free trial now.
RSH_LVLING_CONFLICTS505
&1: No work center capacity available. See long text.
What causes this issue? The work center is not available on the selected day or time and thus does not have any capacity.System Response The selecte...
RSH_LVLING_CONFLICTS504
&1: Operation cannot be scheduled automatically
What causes this issue? In automatic scheduling, the app tries to schedule order operations in such a way that they start and end in the target week....
RSH_PROJ_ASG002
Please enter an end date for the assignment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RSH_PROJ_ASG003
Assignment start date is greater than assignment end date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.