Message type: E = Error
Message class: RSH_ACTIVITY - Messages for use in Activities
Message number: 013
Message text: &1 used automatic scheduling. Not all operations could be scheduled.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RSH_ACTIVITY013
- &1 used automatic scheduling. Not all operations could be scheduled. ?The SAP error message RSH_ACTIVITY013 indicates that there was an issue with the automatic scheduling of operations in a project or production order. The message typically means that not all operations could be scheduled due to various reasons, which can include resource constraints, conflicts in scheduling, or missing dependencies.
Causes:
- Resource Constraints: The resources (machines, labor, etc.) required for certain operations may not be available at the scheduled time.
- Conflicting Operations: There may be overlapping operations that cannot be scheduled simultaneously due to resource limitations or dependencies.
- Missing Dependencies: Some operations may depend on the completion of previous operations that have not been finished or scheduled.
- Capacity Issues: The capacity of the work center may not be sufficient to handle the load of all operations.
- Incorrect Scheduling Parameters: The scheduling parameters set in the system may not be appropriate for the operations being scheduled.
Solutions:
- Check Resource Availability: Review the availability of resources and ensure that they are not overbooked or unavailable during the required time slots.
- Adjust Scheduling Parameters: Modify the scheduling parameters in the project or production order to better fit the available resources and constraints.
- Review Dependencies: Ensure that all dependencies between operations are correctly defined and that preceding operations are completed before scheduling subsequent ones.
- Capacity Planning: Analyze the capacity of work centers and adjust the scheduling to ensure that operations can be accommodated within the available capacity.
- Manual Scheduling: If automatic scheduling fails, consider manually scheduling the operations to resolve conflicts and ensure that all operations are accounted for.
- Error Logs: Check the error logs or scheduling logs for more detailed information about which operations could not be scheduled and why.
Related Information:
CO02
(Change Production Order) or C223
(Change Work Center) to review and adjust the relevant settings.By following these steps, you should be able to identify the root cause of the scheduling issue and implement a solution to resolve the error message RSH_ACTIVITY013.
Get instant SAP help. Start your 7-day free trial now.
RSH_ACTIVITY012
&1 used automatic scheduling for selected operations.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RSH_ACTIVITY011
&1 scheduled &2 to start on &3 at &4.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RSH_ACTIVITY014
&1 confirmed operation &2.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RSH_ACTIVITY015
&1 dispatched some operations from the schedule.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.