How To Fix RSBPCR_EXCEPTION029 - Unexpected resource payload and binary payload are set at same time


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RSBPCR_EXCEPTION - BPC: Persistence Message Class

  • Message number: 029

  • Message text: Unexpected resource payload and binary payload are set at same time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RSBPCR_EXCEPTION029 - Unexpected resource payload and binary payload are set at same time ?
    The SAP error message RSBPCR_EXCEPTION029 indicates that there is a conflict in the payload settings for a process chain in SAP BW (Business Warehouse). Specifically, it means that both a resource payload and a binary payload are being set simultaneously, which is not allowed.
    
    Cause: This error typically occurs when: A process chain is configured incorrectly, where both a resource payload (which is usually a structured data format) and a binary payload (which is typically used for unstructured data) are being defined at the same time. There may be a misconfiguration in the data flow or process chain settings, leading to this conflict. The process chain might be trying to handle different types of data in a way that is not supported by the system.
    Solution: To resolve this error, you can take the following steps: Check Process Chain Configuration: Open the process chain in the SAP BW system. Review the settings for the data transfer processes (DTPs) and ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant