How To Fix RSBPCB_EXCEPTION132 - BPF: Instance &1, could not schedule its step deadline in current status


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RSBPCB_EXCEPTION - BPC: BPF Message Class

  • Message number: 132

  • Message text: BPF: Instance &1, could not schedule its step deadline in current status

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RSBPCB_EXCEPTION132 - BPF: Instance &1, could not schedule its step deadline in current status ?

    The SAP error message RSBPCB_EXCEPTION132 typically occurs in the context of Business Planning and Consolidation (BPC) when a planning instance is unable to schedule its step deadline due to its current status. This can happen for various reasons, and understanding the cause and finding a solution involves several steps.

    Possible Causes:

    1. Instance Status: The instance may be in a status that does not allow it to proceed with scheduling. For example, it might be in a "locked" state or "in progress" state.
    2. Configuration Issues: There may be configuration issues in the BPC environment that prevent the instance from being processed correctly.
    3. Resource Limitations: The system may be experiencing resource limitations, such as memory or processing power, which can affect scheduling.
    4. Dependencies: There may be dependencies on other processes or instances that have not been completed, preventing the current instance from proceeding.
    5. Time Constraints: The scheduling might be affected by time constraints or deadlines that are not being met.

    Solutions:

    1. Check Instance Status: Review the status of the instance in the BPC system. If it is locked or in progress, you may need to unlock it or wait for the current process to complete.
    2. Review Configuration: Ensure that the BPC configuration is correct. Check for any recent changes that might have affected the scheduling process.
    3. Monitor System Resources: Check the system resources (CPU, memory, etc.) to ensure that the system is not overloaded. If necessary, optimize resource allocation or schedule processes during off-peak hours.
    4. Resolve Dependencies: Identify any dependencies that may be blocking the instance from proceeding. Ensure that all prerequisite processes are completed successfully.
    5. Adjust Scheduling Parameters: If applicable, review and adjust the scheduling parameters or deadlines to ensure they align with the current processing capabilities and requirements.
    6. Check Logs: Review the application logs for any additional error messages or warnings that could provide more context about the issue.

    Related Information:

    • SAP Notes: Check SAP Notes related to BPC and the specific error message for any patches or updates that may address the issue.
    • Documentation: Refer to the official SAP BPC documentation for guidance on instance management and scheduling.
    • Support: If the issue persists, consider reaching out to SAP Support for assistance, providing them with detailed information about the error and the steps you have taken to resolve it.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author