How To Fix RS_SMA006 - The Cube &1 is not Hana Optimized.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RS_SMA -

  • Message number: 006

  • Message text: The Cube &1 is not Hana Optimized.

  • Show details Hide details
  • What causes this issue?

    The Cube &V1& is not Hana optimized.

    System Response

    The Cube will not be processed.

    How to fix this error?

    You can convert this Cube to a HANA optimized cube using the transaction
    RSMIGRHANADB.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RS_SMA006 - The Cube &1 is not Hana Optimized. ?

    The SAP error message RS_SMA006 indicates that a specific InfoCube is not optimized for SAP HANA. This typically occurs when you are trying to use a non-HANA-optimized InfoCube in a HANA environment, which can lead to performance issues or incompatibilities.

    Cause:

    1. Non-HANA Optimized InfoCube: The InfoCube in question has not been converted or optimized for use with SAP HANA. This means it may still be using traditional data storage and processing methods that are not suitable for HANA's in-memory capabilities.
    2. Legacy Data Models: The InfoCube may be based on older data modeling techniques that do not leverage the advantages of HANA.
    3. System Configuration: The system may not be configured correctly to recognize or utilize HANA-optimized objects.

    Solution:

    1. Convert the InfoCube: Use the SAP BW (Business Warehouse) tools to convert the InfoCube to a HANA-optimized version. This typically involves:

      • Using the BW Modeling Tools in Eclipse to create a new HANA-optimized InfoCube.
      • Migrating data from the old InfoCube to the new one.
      • Adjusting any queries or reports that reference the old InfoCube to point to the new HANA-optimized version.
    2. Check for SAP Notes: Look for any relevant SAP Notes that may provide additional guidance or fixes related to this error. SAP frequently updates its documentation and provides solutions for common issues.

    3. Review System Configuration: Ensure that your SAP BW system is properly configured to work with HANA. This includes checking the connection settings and ensuring that the necessary components are installed and activated.

    4. Consult Documentation: Refer to the official SAP documentation for guidelines on optimizing InfoCubes for HANA. This may include best practices for data modeling and performance tuning.

    5. Testing: After conversion, thoroughly test the new HANA-optimized InfoCube to ensure that it meets performance expectations and that all reports and queries function correctly.

    Related Information:

    • SAP BW on HANA: Understanding the architecture and capabilities of SAP BW running on HANA can help in optimizing data models.
    • Performance Tuning: Familiarize yourself with performance tuning techniques specific to HANA, as they can significantly impact the efficiency of your data processing.
    • Training and Resources: Consider SAP training courses or resources that focus on HANA optimization and BW modeling to enhance your skills in this area.

    By addressing the underlying issues and following the recommended solutions, you should be able to resolve the RS_SMA006 error and optimize your InfoCube for SAP HANA.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author