How To Fix RPM_LCC022 - Are there no more free CUOBJ numbers?


RPM_LCC022 - Overview

  • Message type: E = Error

  • Message class: RPM_LCC - Messages for the Test Log for the liveCache Routines

  • Message number: 022

  • Message text: Are there no more free CUOBJ numbers?

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


RPM_LCC022 - Details

  • The SAP error message RPM_LCC022, which states "Are there no more free CUOBJ numbers?", typically occurs in the context of SAP Project System (PS) or SAP Real Estate Management (RE) when the system runs out of available "CUOBJ" (Cost Object) numbers. This can happen when the system has reached the maximum limit of cost objects that can be created.
    
    Cause: Exhaustion of CUOBJ Numbers: Each cost object in SAP is assigned a unique identifier (CUOBJ number). If the system has created the maximum number of cost objects allowed, you will encounter this error. Configuration Limits: The configuration settings for the number range of cost objects may be set too low, leading to exhaustion. Data Cleanup: If old or unused cost objects are not archived or deleted, they can occupy CUOBJ numbers unnecessarily.
    Solution: Check Existing CUOBJ Numbers: Review the existing cost objects to see if there are any that can be archived or deleted. This can

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


RPM_LCC022 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker