How To Fix RPM_INTEGRATION515 - Project &1 successfully exported to Project System &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 515

  • Message text: Project &1 successfully exported to Project System &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION515 - Project &1 successfully exported to Project System &2 ?

    The SAP error message RPM_INTEGRATION515 indicates that a project has been successfully exported from one system to another, specifically from a Project Management (RPM) system to a Project System (PS) in SAP. This message is not an error in the traditional sense; rather, it is an informational message indicating that the export process has completed successfully.

    Cause:

    • The message is triggered when a project is exported from the RPM module to the PS module. It confirms that the project data has been transferred correctly.

    Solution:

    Since this message is informational and indicates success, there is no action required to resolve an error. However, if you are looking to ensure that the export process is functioning correctly, you can:

    1. Verify the Export: Check the target Project System (PS) to ensure that the project has been created and all relevant data has been transferred correctly.
    2. Review Logs: If you are expecting an error but see this message, review the logs or any preceding messages to identify if there were any issues before this message was generated.
    3. Documentation: Refer to SAP documentation or help resources for further details on the export process and any specific configurations that may be necessary.

    Related Information:

    • Integration Points: Understand the integration points between RPM and PS to ensure that all necessary data is mapped correctly during the export process.
    • Configuration Settings: Check the configuration settings in both RPM and PS to ensure they are set up to allow for successful data transfer.
    • SAP Notes: Look for any relevant SAP Notes that may provide additional insights or updates related to the integration between RPM and PS.

    If you encounter any issues or unexpected behavior during the export process, it may be helpful to consult with your SAP Basis or functional team for further investigation.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant