How To Fix RPM_INTEGRATION328 - Logical partner not maintained in Portf. Mgmt for project system


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 328

  • Message text: Logical partner not maintained in Portf. Mgmt for project system

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION328 - Logical partner not maintained in Portf. Mgmt for project system ?

    The SAP error message RPM_INTEGRATION328, which states "Logical partner not maintained in Portf. Mgmt for project system," typically occurs in the context of SAP Portfolio and Project Management (PPM) when there is a configuration issue related to the logical partner settings for a project system.

    Cause:

    The error is usually caused by one of the following reasons:

    1. Missing Configuration: The logical partner for the project system has not been defined in the Portfolio Management settings.
    2. Incorrect Assignment: The logical partner may be incorrectly assigned or not assigned at all in the project definition.
    3. Integration Issues: There may be issues with the integration between the Project System (PS) and Portfolio Management (RPM) modules.

    Solution:

    To resolve the RPM_INTEGRATION328 error, you can follow these steps:

    1. Check Logical Partner Configuration:

      • Go to the transaction code SPRO to access the SAP Customizing Implementation Guide.
      • Navigate to Portfolio Management > Integration with Project System > Define Logical Partners.
      • Ensure that the logical partner is defined for the relevant project system.
    2. Maintain Logical Partner in Project Definition:

      • Use transaction code CJ20N (Project Builder) to open the project in question.
      • Check the project definition and ensure that the logical partner is correctly assigned.
      • If it is missing, you can add the logical partner in the project definition.
    3. Check Integration Settings:

      • Ensure that the integration settings between the Project System and Portfolio Management are correctly configured.
      • Review any relevant customizing settings that may affect the integration.
    4. Test the Configuration:

      • After making the necessary changes, test the configuration by trying to execute the transaction that previously resulted in the error.
    5. Consult Documentation:

      • If the issue persists, refer to SAP documentation or support notes related to the error message for additional troubleshooting steps.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), SPRO (Customizing), and CJ01 (Create Work Breakdown Structure).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles and Authorizations: Ensure that the user has the necessary authorizations to make changes to project definitions and logical partner settings.

    By following these steps, you should be able to resolve the RPM_INTEGRATION328 error and ensure that the logical partner is properly maintained in the Portfolio Management for the project system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant