How To Fix RPM_INTEGRATION224 - Project synchronization started at &1 &2


RPM_INTEGRATION224 - Overview

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 224

  • Message text: Project synchronization started at &1 &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION224 - Project synchronization started at &1 &2 ?
    The SAP error message RPM_INTEGRATION224, which states "Project synchronization started at &1 &2," typically indicates that there is an ongoing synchronization process between SAP Project Management and another system, such as SAP S/4HANA or SAP Project System (PS). This message is informational and does not necessarily indicate an error; rather, it is a notification that the synchronization process has been initiated.
    
    Cause: Synchronization Process: The message is triggered when a synchronization process is initiated. This could be due to a scheduled job or a manual trigger. Long-running Process: If the synchronization takes longer than expected, users may see this message for an extended period. System Load: High system load or performance issues can delay the synchronization process, causing the message to appear for longer durations.
    Solution: Monitor the Process: Check the status of the synchronization process. You can do this by looking at the relevant transaction codes (e.g., SM37 for job monitoring) to see if the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker