How To Fix RPM_INTEGRATION149 - Could not import project from PLM PS system


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 149

  • Message text: Could not import project from PLM PS system

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION149 - Could not import project from PLM PS system ?

    The SAP error message RPM_INTEGRATION149, which states "Could not import project from PLM PS system," typically occurs when there are issues related to the integration between the Project Lifecycle Management (PLM) and Project System (PS) modules in SAP. This error can arise due to various reasons, including configuration issues, data inconsistencies, or connectivity problems.

    Possible Causes:

    1. Configuration Issues: The integration settings between PLM and PS may not be correctly configured. This includes settings in the SAP system that govern how data is transferred between the two modules.

    2. Authorization Problems: The user attempting to import the project may not have the necessary authorizations to access the required data in the PLM or PS systems.

    3. Data Inconsistencies: There may be inconsistencies or missing data in the project that is being imported, such as missing master data or incorrect project structures.

    4. Network or Connectivity Issues: If the PLM and PS systems are on different servers or environments, there may be network issues preventing successful communication between them.

    5. Version Compatibility: The versions of the PLM and PS systems may not be compatible, leading to issues during the import process.

    Solutions:

    1. Check Configuration: Review the integration settings between PLM and PS. Ensure that all necessary configurations are correctly set up. This may involve checking transaction codes like CVI (Customer-Vendor Integration) or SPRO (SAP Project Reference Object).

    2. Verify Authorizations: Ensure that the user has the appropriate authorizations to perform the import. This can be checked in the user roles and profiles assigned to the user.

    3. Data Validation: Validate the project data in the PLM system to ensure that all required fields are filled and that there are no inconsistencies. You may need to check for missing master data or incorrect project structures.

    4. Network Check: If applicable, check the network connectivity between the PLM and PS systems. Ensure that there are no firewalls or network issues blocking the communication.

    5. Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error. There may be patches or updates that resolve known issues.

    6. Debugging: If you have access to technical resources, consider debugging the import process to identify the exact point of failure. This may provide more detailed information about the cause of the error.

    7. Contact SAP Support: If the issue persists after trying the above solutions, consider reaching out to SAP Support for further assistance. Provide them with detailed information about the error, including any logs or screenshots.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) and CJI3 (Project Actual Line Items) for managing projects in the PS module.
    • Integration Documentation: Review SAP documentation related to PLM and PS integration for best practices and troubleshooting tips.
    • User Forums: Consider checking SAP community forums or user groups for similar issues and solutions shared by other users.

    By following these steps, you should be able to diagnose and resolve the RPM_INTEGRATION149 error effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker