How To Fix RPM_INTEGRATION098 - Could not update project actual dates


RPM_INTEGRATION098 - Overview

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 098

  • Message text: Could not update project actual dates

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION098 - Could not update project actual dates ?
    The SAP error message RPM_INTEGRATION098, which states "Could not update project actual dates," typically occurs in the context of project management within SAP, particularly when there are issues related to the integration of project data or when trying to update project actual dates in the system.
    Causes:
    
    Data Inconsistency: There may be inconsistencies in the project data that prevent the system from updating the actual dates.
    Authorization Issues: The user may not have the necessary permissions to update project data.
    Locked Objects: The project or related objects may be locked by another user or process, preventing updates.
    Missing Required Fields: Certain required fields may not be filled out, leading to the inability to update the project.
    Integration Issues: Problems with the integration between different SAP modules (e.g., Project System and Controlling) can lead to this error.
    Technical Errors: There may be underlying technical issues, such as database problems or system configuration errors.
    
    Solutions:
    
    Check Data Consistency: Review the project

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker