How To Fix RPM_INTEGRATION098 - Could not update project actual dates


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 098

  • Message text: Could not update project actual dates

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION098 - Could not update project actual dates ?

    The SAP error message RPM_INTEGRATION098, which states "Could not update project actual dates," typically occurs in the context of project management within SAP, particularly when there are issues related to the integration of project data or when trying to update project actual dates in the system.

    Causes:

    1. Data Inconsistency: There may be inconsistencies in the project data that prevent the system from updating the actual dates.
    2. Authorization Issues: The user may not have the necessary permissions to update project data.
    3. Locked Objects: The project or related objects may be locked by another user or process, preventing updates.
    4. Missing Required Fields: Certain required fields may not be filled out, leading to the inability to update the project.
    5. Integration Issues: Problems with the integration between different SAP modules (e.g., Project System and Controlling) can lead to this error.
    6. Technical Errors: There may be underlying technical issues, such as database problems or system configuration errors.

    Solutions:

    1. Check Data Consistency: Review the project data for any inconsistencies or missing information. Ensure that all required fields are filled out correctly.
    2. Verify Authorizations: Ensure that the user attempting to make the update has the necessary authorizations to modify project data.
    3. Unlock Objects: Check if the project or related objects are locked. If they are, you may need to wait for the lock to be released or contact the user who has locked the object.
    4. Review Integration Settings: If the error is related to integration, check the settings and configurations between the relevant SAP modules to ensure they are correctly set up.
    5. Check for Technical Issues: Consult with your SAP Basis team to check for any underlying technical issues, such as database errors or system performance problems.
    6. Consult SAP Notes: Look for relevant SAP Notes or documentation that may address this specific error. SAP frequently updates its knowledge base with solutions for common issues.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CJ02 (Change Project) to navigate and check project details.
    • SAP Support: If the issue persists, consider reaching out to SAP Support for assistance, providing them with the error message and any relevant details about the situation.
    • User Forums: Check SAP community forums or user groups for similar issues and solutions shared by other users.

    By following these steps, you should be able to identify the cause of the RPM_INTEGRATION098 error and implement a suitable solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant