Do you have any question about this error?
Message type: E = Error
Message class: RPM_INTEGRATION - Integration Messages
Message number: 089
Message text: Error while retrieving PLM PS project defintion &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RPM_INTEGRATION089
- Error while retrieving PLM PS project defintion & ?The SAP error message RPM_INTEGRATION089 typically occurs in the context of SAP Project System (PS) and Product Lifecycle Management (PLM) integration. This error indicates that there was an issue retrieving the project definition from the PLM system.
Causes:
- Missing or Incomplete Data: The project definition in the PLM system may be incomplete or missing required fields.
- Authorization Issues: The user may not have the necessary authorizations to access the project data in the PLM system.
- Configuration Issues: There may be configuration problems in the integration settings between SAP PS and PLM.
- Network Issues: Connectivity problems between the SAP systems can lead to this error.
- System Performance: If the PLM system is under heavy load, it may not respond in a timely manner, leading to timeouts.
Solutions:
- Check Project Definition: Verify that the project definition exists in the PLM system and that all required fields are filled out correctly.
- Review Authorizations: Ensure that the user has the necessary authorizations to access the project data in both SAP PS and PLM.
- Integration Configuration: Review the integration settings between SAP PS and PLM. Ensure that all necessary configurations are correctly set up.
- Network Connectivity: Check the network connection between the SAP systems to ensure there are no connectivity issues.
- System Performance: Monitor the performance of the PLM system. If it is under heavy load, consider optimizing the system or scheduling the integration during off-peak hours.
Related Information:
CVI_CHECK
or CVI_MAINTAIN
to check for issues related to the integration.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
RPM_INTEGRATION088
Project currency (Portf. Mgmt) initial, (PLM PS) &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RPM_INTEGRATION087
Finish changed to & to maintain continuity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RPM_INTEGRATION090
Business object type not supported for application
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RPM_INTEGRATION091
RFC destination & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.