How To Fix RPM_INTEGRATION080 - Project &1 has been changed successfully


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 080

  • Message text: Project &1 has been changed successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION080 - Project &1 has been changed successfully ?

    The SAP error message RPM_INTEGRATION080 indicates that a project has been changed successfully in the context of SAP Project Management or SAP Portfolio and Project Management (PPM). This message is not an error in the traditional sense; rather, it is an informational message indicating that a project has been updated.

    Cause:

    • The message is triggered when a project is modified, and the system confirms that the changes have been applied successfully. This could occur during various operations, such as updating project details, changing project status, or modifying project attributes.

    Solution:

    Since this message is informational and not an error, there is no specific solution required. However, if you are seeing this message and it is unexpected, consider the following steps:

    1. Verify Changes: Check the project details to ensure that the intended changes have been made correctly.
    2. Review Logs: If you are integrating with other systems or processes, review any logs or integration points to ensure that the changes are reflected as expected.
    3. User Training: Ensure that users are aware that this message is informational and does not indicate a problem.

    Related Information:

    • SAP Documentation: Refer to the official SAP documentation for Project Management or PPM for more details on project management processes and messages.
    • Transaction Codes: Familiarize yourself with relevant transaction codes (e.g., CJ20N for project management) to navigate and manage projects effectively.
    • Support: If you encounter issues beyond this message, consider reaching out to your SAP support team or consulting the SAP Community for further assistance.

    In summary, RPM_INTEGRATION080 is a confirmation message indicating successful changes to a project, and no action is typically required unless there are specific concerns about the changes made.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant