How To Fix RPM_INTEGRATION002 - Project &1 does not exist in Portfolio Management


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_INTEGRATION - Integration Messages

  • Message number: 002

  • Message text: Project &1 does not exist in Portfolio Management

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_INTEGRATION002 - Project &1 does not exist in Portfolio Management ?

    The SAP error message RPM_INTEGRATION002 indicates that the specified project (denoted by &1) does not exist in the Portfolio Management module. This error typically arises when there is an attempt to access or integrate a project that has not been created or is not recognized in the system.

    Causes:

    1. Project Not Created: The project may not have been created in the Portfolio Management module.
    2. Incorrect Project ID: The project ID being referenced may be incorrect or misspelled.
    3. Project Deletion: The project may have been deleted or archived, making it unavailable for integration.
    4. Authorization Issues: The user may not have the necessary permissions to view or access the project.
    5. Integration Issues: There may be issues with the integration between different SAP modules or systems, leading to the project not being recognized.

    Solutions:

    1. Verify Project Existence:

      • Check if the project ID exists in the Portfolio Management module. You can do this by navigating to the relevant transaction (e.g., CJ20N for Project Builder) and searching for the project.
    2. Check Project ID:

      • Ensure that the project ID you are using is correct. Look for any typographical errors or discrepancies.
    3. Create the Project:

      • If the project does not exist, you may need to create it in the Portfolio Management module. Use the appropriate transaction code (e.g., CJ20N) to create a new project.
    4. Review Deletion/Archiving:

      • If the project was deleted or archived, you may need to restore it or create a new project as necessary.
    5. Check Authorizations:

      • Ensure that the user has the necessary authorizations to access the project. You may need to consult with your SAP security team to verify and adjust user roles and permissions.
    6. Integration Check:

      • If the error is related to integration between different SAP modules (e.g., Project System and Portfolio Management), check the integration settings and configurations. Ensure that the necessary settings are in place for data synchronization.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ01 (Create Work Breakdown Structure), and CJ02 (Change Work Breakdown Structure).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. You can search the SAP Support Portal for relevant notes.
    • Documentation: Review SAP documentation for Portfolio Management and Project System to understand the integration points and requirements.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker