How To Fix RPM_DATA_CONSISTNECY027 - Role demand finish date later than role finish date, role date updated


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_DATA_CONSISTNECY - Consistency messages for date and content checks

  • Message number: 027

  • Message text: Role demand finish date later than role finish date, role date updated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_DATA_CONSISTNECY027 - Role demand finish date later than role finish date, role date updated ?

    The SAP error message RPM_DATA_CONSISTENCY027 indicates that there is a discrepancy in the role demand dates within the Resource and Project Management (RPM) module. Specifically, this error occurs when the finish date of a role demand is later than the finish date of the role itself, which is not allowed as it creates a logical inconsistency in the project data.

    Cause:

    1. Role Demand Configuration: The role demand has been set with a finish date that exceeds the finish date of the role assigned to it.
    2. Data Entry Error: There may have been a manual entry error when inputting the dates for either the role or the role demand.
    3. Changes in Project Timeline: If the project timeline has been adjusted after the role demand was created, it may lead to this inconsistency.
    4. System Updates: Sometimes, updates or changes in the system can lead to inconsistencies if not properly synchronized.

    Solution:

    1. Review Role and Role Demand Dates:

      • Navigate to the role demand and check the finish date.
      • Compare it with the finish date of the associated role.
      • Ensure that the role demand finish date does not exceed the role finish date.
    2. Adjust Dates:

      • If the role demand finish date is incorrect, update it to a date that is on or before the role finish date.
      • If the role finish date needs to be extended, ensure that it aligns with the project requirements and update it accordingly.
    3. Data Consistency Check:

      • After making adjustments, run a data consistency check in the RPM module to ensure that all related data is consistent and that no other discrepancies exist.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidelines on managing role demands and roles within the RPM module.
    5. Contact Support:

      • If the issue persists or if you are unsure about making changes, consider reaching out to your SAP support team or consulting with an SAP expert.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Training and Documentation: Ensure that users involved in project management are trained on the correct procedures for entering and managing role demands and roles.
    • System Configuration: Review the configuration settings in the RPM module to ensure they align with your organization's project management processes.

    By addressing the root cause of the error and ensuring that the role demand and role dates are consistent, you can resolve the RPM_DATA_CONSISTENCY027 error effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant