How To Fix RPM_DATA_CONSISTNECY017 - Dates of related role adjusted; planned start: &1, planned finish: &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_DATA_CONSISTNECY - Consistency messages for date and content checks

  • Message number: 017

  • Message text: Dates of related role adjusted; planned start: &1, planned finish: &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_DATA_CONSISTNECY017 - Dates of related role adjusted; planned start: &1, planned finish: &2 ?

    The SAP error message RPM_DATA_CONSISTENCY017 indicates that there is a data consistency issue related to the dates of a role in a project. Specifically, it suggests that the planned start and finish dates of a related role have been adjusted, which may lead to inconsistencies in the project planning or scheduling.

    Cause:

    The error typically arises due to one or more of the following reasons:

    1. Date Overlap: The planned start and finish dates of the role conflict with other roles or tasks in the project.
    2. Incorrect Date Entries: The dates entered for the role may not align with the overall project timeline or may be incorrectly formatted.
    3. Changes in Project Structure: Modifications in the project structure, such as changes in dependencies or milestones, can lead to automatic adjustments of role dates.
    4. Resource Availability: If the resources assigned to the role are not available during the planned dates, the system may adjust the dates automatically.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Role Dates: Review the planned start and finish dates of the role in question. Ensure they are correctly set and do not overlap with other roles or tasks.
    2. Review Project Structure: Examine the overall project structure for any changes that may have affected the role's dates. Ensure that dependencies and milestones are correctly defined.
    3. Resource Allocation: Verify the availability of resources assigned to the role. If resources are not available, consider adjusting the role's dates or reallocating resources.
    4. Adjust Dates Manually: If the system has automatically adjusted the dates, you may need to manually set them back to the desired values, ensuring they comply with the project timeline.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on managing roles and dates within the project management module.

    Related Information:

    • Transaction Codes: You may use transaction codes like CJ20N (Project Builder) or CJ02 (Change Project) to view and edit project roles and their dates.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional guidance on this error message.
    • User Roles and Authorizations: Ensure that you have the necessary authorizations to make changes to project roles and dates.

    If the issue persists after following these steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker