How To Fix RPM_CAPACITY_MGR038 - Role start/finish not specified


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_CAPACITY_MGR - Message Class for Capacity Management

  • Message number: 038

  • Message text: Role start/finish not specified

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_CAPACITY_MGR038 - Role start/finish not specified ?

    The SAP error message RPM_CAPACITY_MGR038, which indicates that a role's start and finish dates are not specified, typically occurs in the context of project management or resource planning within SAP's Project System (PS) or Resource Management modules. This error can prevent users from proceeding with certain operations, such as scheduling or assigning resources to tasks.

    Cause:

    The error is caused by the absence of defined start and finish dates for a role in a project or resource assignment. This can happen due to:

    1. Incomplete Role Definition: The role may have been created without specifying the necessary date parameters.
    2. Data Entry Errors: Users may have inadvertently skipped entering the start and finish dates when creating or modifying a role.
    3. System Configuration Issues: There may be configuration settings in the SAP system that require these dates but are not being enforced correctly.

    Solution:

    To resolve the RPM_CAPACITY_MGR038 error, follow these steps:

    1. Check Role Definition:

      • Navigate to the role definition in the SAP system.
      • Ensure that both the start and finish dates are specified for the role in question.
    2. Edit Role Dates:

      • If the dates are missing, edit the role to include the appropriate start and finish dates.
      • Make sure the dates are logical and align with the project timeline.
    3. Validate Data Entry:

      • Review any recent changes made to roles or assignments to ensure that all required fields were filled out correctly.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for guidance on the specific module you are working with, as there may be additional requirements or best practices for defining roles.
    5. Check Configuration Settings:

      • If the issue persists, consult with your SAP system administrator or a functional consultant to review the configuration settings related to role management and ensure they are set up correctly.
    6. Testing:

      • After making the necessary changes, test the role assignment or scheduling process again to confirm that the error has been resolved.

    Related Information:

    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CATS (Cross-Application Time Sheets) for managing project roles and resources.
    • User Roles and Authorizations: Ensure that users have the necessary authorizations to create or modify roles and their associated dates.

    By following these steps, you should be able to resolve the RPM_CAPACITY_MGR038 error and continue with your project management tasks in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.