How To Fix RPM_APPL022 - No link exist bet. Project System element and Portf. and Proj. Mgmt items


RPM_APPL022 - Overview

  • Message type: E = Error

  • Message class: RPM_APPL - RPM Appl messages

  • Message number: 022

  • Message text: No link exist bet. Project System element and Portf. and Proj. Mgmt items

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_APPL022 - No link exist bet. Project System element and Portf. and Proj. Mgmt items ?
    The SAP error message RPM_APPL022 indicates that there is no link between a Project System (PS) element and Portfolio and Project Management (PPM) items. This error typically arises when there is an attempt to perform an operation that requires a connection between these two components, but such a connection does not exist.
    
    Cause: Missing Link: The most common cause is that the Project System element (like a project or WBS element) has not been properly linked to the corresponding Portfolio and Project Management item.
    Configuration Issues: There may be configuration issues in the system that prevent the linkage from being established. Data Inconsistencies: There could be inconsistencies in the data that prevent the system from recognizing the relationship between the PS element and the PPM items. Authorization Issues: Sometimes, authorization issues can prevent the system from accessing the necessary data to establish the link.
    Solution: Check Linkage: Verify that the Project System element is correctly linked to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker