Do you have any question about this error?
Message type: E = Error
Message class: /RPM/PLANNING -
Message number: 320
Message text: Production run
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/RPM/PLANNING320
- Production run ?The SAP error message
/RPM/PLANNING320
typically relates to issues encountered during the production planning process in SAP, particularly when dealing with production runs. This error can arise due to various reasons, and understanding the context is crucial for troubleshooting.Possible Causes:
- Missing Master Data: The error may occur if there are missing or incorrect master data records, such as material master, routing, or work center data.
- Capacity Issues: If the production run exceeds the available capacity of the work center, this error can be triggered.
- Scheduling Conflicts: Conflicts in scheduling, such as overlapping production orders or resource allocation issues, can lead to this error.
- Incorrect Parameters: Incorrect parameters or settings in the production planning configuration can also cause this error.
- Material Availability: If the required materials are not available or not properly planned, it can lead to this error.
Solutions:
- Check Master Data: Verify that all relevant master data (material, routing, work center) is correctly set up and complete.
- Review Capacity Planning: Ensure that the work center has sufficient capacity to handle the production run. Adjust capacity or reschedule production orders as necessary.
- Analyze Scheduling: Look for any scheduling conflicts or overlapping production orders that may be causing the issue. Adjust the schedule accordingly.
- Validate Parameters: Review the production planning parameters and settings to ensure they are correctly configured.
- Material Availability Check: Conduct a material availability check to ensure that all required materials are available for the production run. If not, adjust the procurement or production plan.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
/RPM/PLANNING319
Test run
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/RPM/PLANNING318
Transaction failed due to errors in transfer
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/RPM/PLANNING321
Transfer successful
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/RPM/PLANNING322
Currency conversion not been maintained between &1 and &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...