How To Fix /RPM/PLANNING012 - Finish date missing for item &1; cannot plan for period type TOTAL


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /RPM/PLANNING -

  • Message number: 012

  • Message text: Finish date missing for item &1; cannot plan for period type TOTAL

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /RPM/PLANNING012 - Finish date missing for item &1; cannot plan for period type TOTAL ?

    The SAP error message /RPM/PLANNING012 Finish date missing for item &1; cannot plan for period type TOTAL typically occurs in the context of project planning or resource management within the SAP system, particularly when using the SAP Resource and Project Management (RPM) module. This error indicates that a finish date is not specified for a particular item, which is necessary for planning activities.

    Cause:

    1. Missing Finish Date: The primary cause of this error is that the finish date for the specified item (denoted by &1) is not defined in the system. This is essential for the planning process, especially when dealing with total period types.
    2. Incorrect Configuration: There may be issues with the configuration of the planning parameters or settings that lead to the omission of the finish date.
    3. Data Entry Errors: The finish date may have been inadvertently left blank during data entry or may have been deleted.

    Solution:

    1. Check Item Details: Navigate to the item in question and verify if the finish date is indeed missing. If it is, enter the appropriate finish date.
    2. Review Planning Parameters: Ensure that the planning parameters and settings are correctly configured to allow for the entry of finish dates.
    3. Data Validation: Implement data validation checks to ensure that all required fields, including finish dates, are filled out before saving or processing planning data.
    4. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on how to enter or correct finish dates for items in the RPM module.
    5. User Training: If this error is common among users, consider providing training on the importance of completing all required fields in the planning process.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP that pertain to project planning and resource management, such as CJ20N (Project Builder) or CJR2 (Change Project).
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address the issue.
    • System Logs: Review system logs for any additional error messages or warnings that may provide context for the issue.
    • Support: If the problem persists after checking the above, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By addressing the missing finish date and ensuring proper data entry practices, you should be able to resolve the error and proceed with your planning activities in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker