Do you have any question about this error?
Message type: E = Error
Message class: RP - Error Messages for Infotype Module Pools
Message number: 712
Message text: Operations numbers of client & and cycle & have been updated
During transport, the system checked whether the internal operation
numbers in the cycle correspond with the numbers in T52A0. This was not
the case in this cycle. The numbers have now been updated.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
This message appears for information purposes only and requires no
further action to be taken.
Error message extract from SAP system. Copyright SAP SE.
RP712
- Operations numbers of client & and cycle & have been updated ?The SAP error message RP712 indicates that there is a discrepancy in the operation numbers for a specific client and cycle in the payroll processing. This error typically arises during the payroll run when the system detects that the operation numbers (which are used to track payroll processing steps) have been updated or changed in a way that is inconsistent with the expected values.
Cause:
- Data Inconsistency: The operation numbers for the payroll cycle may have been modified or updated in the database, leading to a mismatch with the expected values.
- Concurrent Processing: If multiple payroll runs are being processed simultaneously, it can lead to conflicts in operation numbers.
- Configuration Changes: Changes in payroll configuration or master data that affect the operation numbers can also trigger this error.
- Incomplete Payroll Run: If a previous payroll run was not completed successfully, it may leave the operation numbers in an inconsistent state.
Solution:
- Check Payroll Logs: Review the payroll logs for any errors or warnings that occurred during the payroll run. This can provide insights into what went wrong.
- Reprocess Payroll: If the payroll run was incomplete, you may need to reprocess the payroll for the affected client and cycle.
- Verify Configuration: Ensure that there have been no recent changes to payroll configuration that could affect operation numbers. If changes were made, verify that they are correct.
- Check for Concurrent Runs: Ensure that no other payroll runs are being processed for the same client and cycle at the same time.
- Database Consistency: If necessary, perform a consistency check on the database to ensure that all relevant tables are in sync.
- Contact SAP Support: If the issue persists, consider reaching out to SAP support for further assistance, especially if it appears to be a bug or a deeper system issue.
Related Information:
By following these steps, you should be able to identify the root cause of the RP712 error and take appropriate action to resolve it.
Get instant SAP help. Start your 7-day free trial now.
RP711
Operation numbers of client & and cycle & unchanged
What causes this issue? During transport, the system checked whether the internal operation numbers in the specified cycle correspond with the number...
RP710
Report & generated
What causes this issue? The system generated the report from table entries.System Response The system issues an error message and will not allow you...
RP713
Program class missing for client & and cycle &
What causes this issue? Each cycle must be assigned a programm class. No program class has been defined for this cycle. It could therefore not be cor...
RP714
Operation & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.