Do you have any question about this error?
Message type: E = Error
Message class: RMXTPP - TMS-PP: Messages for PP Component
Message number: 088
Message text: Material availability is no longer checked
The date for the trial production has been changed. The material
availability was checked for the previous date. However, the system does
not automatically check the material availability for the new date.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If necessary, check the material availability for the new date manually
in the planned order.
Error message extract from SAP system. Copyright SAP SE.
RMXTPP088
- Material availability is no longer checked ?The SAP error message RMXTPP088, which states "Material availability is no longer checked," typically occurs in the context of production planning and material requirements planning (MRP) processes. This message indicates that the system has determined that material availability checks are not applicable for the specific operation or scenario you are working with.
Cause:
- Material Status: The material may have a status that prevents availability checks, such as being marked as "blocked" or "not available for production."
- Configuration Settings: The configuration settings in the material master or in the MRP settings may have been set to bypass availability checks for certain materials or scenarios.
- Production Order Status: The production order may be in a status that does not allow for availability checks, such as being completed or canceled.
- Planning Parameters: The planning parameters for the material may be set to not check availability, which can be configured in the material master or in the MRP settings.
Solution:
- Check Material Status: Review the material status in the material master (transaction MM03) to ensure it is not blocked or restricted for use in production.
- Review MRP Settings: Check the MRP settings for the material (transaction MM02) to ensure that the availability check is enabled. Look for the "MRP 2" view and verify the settings related to availability checks.
- Production Order Review: If you are working with a production order, check the status of the order (transaction CO03) to ensure it is in a status that allows for availability checks.
- Check Planning Parameters: Review the planning parameters in the material master to ensure that the availability check is set correctly. This can include checking the "Availability Check" field in the MRP 2 view.
- Consult Documentation: If the issue persists, consult SAP documentation or your organization's SAP support team for further assistance, as there may be specific configurations or customizations in your system.
Related Information:
By following these steps, you should be able to identify the cause of the RMXTPP088 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
RMXTPP087
Select a valid resource
What causes this issue? You want to carry out trial planning for one or more resources. None of the selected resources exist in the system.System Res...
RMXTPP086
Planned date &1 is in the past
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP089
Error when saving data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP090
Finished prod. for plnd order is not the same as finished prod. for trial
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.