Do you have any question about this error?
Message type: E = Error
Message class: RMXTPP - TMS-PP: Messages for PP Component
Message number: 066
Message text: Trial &1 is assigned BOM alternative &2 for material &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RMXTPP066
- Trial &1 is assigned BOM alternative &2 for material &3 ?The SAP error message RMXTPP066 indicates that a specific trial (or test) is assigned a Bill of Materials (BOM) alternative for a given material. This message typically arises in the context of production planning or material management when there is an issue with the configuration of BOMs for a material.
Cause:
The error can occur due to several reasons:
- BOM Configuration: The BOM alternative specified may not be correctly configured or may not exist for the material in question.
- Material Master Data: The material master data may not be set up correctly, leading to inconsistencies in how BOMs are assigned.
- Trial Assignment: The trial may be incorrectly assigned to a BOM alternative that is not valid or does not meet the necessary criteria for the material.
- Missing Data: There may be missing or incomplete data in the BOM or material master that prevents the system from processing the trial correctly.
Solution:
To resolve the RMXTPP066 error, you can take the following steps:
Check BOM Configuration:
- Go to the BOM transaction (e.g., CS03) and verify that the BOM alternative specified in the error message exists for the material.
- Ensure that the BOM alternative is active and correctly configured.
Review Material Master Data:
- Check the material master data (transaction MM03) for the material in question. Ensure that all relevant fields are filled out correctly, especially those related to BOMs and production.
Validate Trial Assignment:
- Review the assignment of the trial to the BOM alternative. Ensure that the trial is correctly linked to the appropriate BOM alternative for the material.
Consult Documentation:
- If necessary, refer to SAP documentation or help resources for guidance on BOM management and trial assignments.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the RMXTPP066 error and implement the necessary corrections.
Get instant SAP help. Start your 7-day free trial now.
RMXTPP065
Master recipe &1, recipe group &2 of trial &3 was deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP064
Delimitation of planning period is incomplete
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP067
Trial &1 is assigned production version &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP068
PP-PI objects are still assigned to the trial &1
What causes this issue? You want to assign PP-PI objects to the trial &V1& (by transforming a recipe, for example).System Response The syste...
Click on this link to search all SAP messages.