How To Fix RMXTPP009 - Date &1 is not within the planning period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RMXTPP - TMS-PP: Messages for PP Component

  • Message number: 009

  • Message text: Date &1 is not within the planning period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RMXTPP009 - Date &1 is not within the planning period ?
    The SAP error message RMXTPP009, which states "Date &1 is not within the planning period," typically occurs in the context of planning and forecasting within SAP systems, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). This error indicates that the date you are trying to use for a planning activity (such as creating a plan, running a forecast, or executing a planning run) falls outside the defined planning period.
    
    Cause: Planning Period Configuration: The planning period may not be set up correctly in the system. This could be due to the planning horizon being too narrow or not including the date you are trying to use. Date Input Error: The date you are entering may be incorrect or formatted improperly. Master Data Issues: The master data (like product, location, etc.) may not be set up correctly, leading to planning periods not being recognized. Versioning Issues: If you

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker