Message type: E = Error
Message class: RMXTPP - TMS-PP: Messages for PP Component
Message number: 003
Message text: Planned order data is incomplete
You want to create a planned order for a trial, but the trial data
is incomplete.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The following trial data is required to create a planned order:
Plant
Trial product
Target quantity of the trial product
Requested trial start
Trial duration
Trial duration unit
Complete the trial data.
Error message extract from SAP system. Copyright SAP SE.
RMXTPP003
- Planned order data is incomplete ?The SAP error message RMXTPP003, which states "Planned order data is incomplete," typically occurs during the planning or execution of production orders in the SAP system. This error indicates that certain required fields or data for the planned order are missing or not properly configured.
Causes:
- Missing Data: Required fields in the planned order, such as material, quantity, or dates, may not be filled in.
- Configuration Issues: The material master or production version may not be set up correctly, leading to incomplete data.
- Routing Issues: The routing for the production process may be incomplete or missing, which can prevent the system from generating a complete planned order.
- Bill of Materials (BOM): If the BOM is not properly defined or is missing components, it can lead to incomplete planned order data.
- Master Data Issues: Incomplete or incorrect master data for materials, work centers, or production resources can also trigger this error.
Solutions:
- Check Planned Order Data: Review the planned order in question to ensure all required fields are filled out correctly. This includes checking the material, quantity, and dates.
- Review Material Master: Ensure that the material master data is complete and correctly configured. Check for any missing views or data that may be required for production planning.
- Verify Routing: Check the routing associated with the planned order to ensure it is complete and correctly defined. Make sure all operations and sequences are included.
- Examine BOM: Ensure that the Bill of Materials is complete and that all necessary components are included and correctly defined.
- Check Configuration Settings: Review the configuration settings in the SAP system related to production planning to ensure they are set up correctly.
- Use Transaction Codes: Utilize transaction codes like MD04 (Stock/Requirements List) or CO01 (Create Production Order) to analyze the planned order and identify missing data.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
RMXTPP002
Plant &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP001
Planning was not started
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP004
Trial type &1 is not assigned a transformation group
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP005
Trial &1 is not assigned a planned order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...