Do you have any question about this error?
Message type: E = Error
Message class: RMX - Error Messages for the XPRA "Abolishing the RS Header"
Message number: 011
Message text: RS header &1 (client &2/plant &3) lies in the future. Please check
Run schedule header &V1& lies in the future.
The run schedule header is not convered. The deletion indicator is set.
If postings have already been carried out for this run schedule header,
it must be postprocessed. The product cost collector has to be settled.
No further postings are possible for this run schedule header.
If no postings have been carried out for this run schedule header, it
does not have to be postprocessed. No further postings are possible for
this run schedule header.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
RMX011
- RS header &1 (client &2/plant &3) lies in the future. Please check ?The SAP error message RMX011 indicates that there is an issue with the RS (Requirements) header for a specific client and plant combination, where the date associated with the header lies in the future. This typically occurs in the context of materials management, production planning, or similar modules where date-sensitive data is processed.
Cause:
- Future Date in Header: The most common cause of this error is that the date in the RS header (such as a requirement date or planning date) is set to a future date that is not acceptable based on the system's configuration or business rules.
- Incorrect Data Entry: There may have been an error during data entry, leading to an incorrect date being assigned.
- Master Data Issues: The master data for the material or plant may not be correctly set up, leading to inconsistencies in date handling.
- Configuration Settings: The system configuration may restrict processing of future dates beyond a certain threshold.
Solution:
- Check the RS Header: Review the RS header for the specified client and plant. Look for any dates that are set in the future and determine if they need to be adjusted.
- Adjust Dates: If the date is indeed incorrect, update it to a valid date that is within the acceptable range for processing.
- Review Master Data: Ensure that the master data for the material and plant is correctly configured, including any relevant date settings.
- Configuration Review: Check the configuration settings in the system to see if there are any restrictions on future dates. If necessary, consult with your SAP Basis or configuration team to adjust these settings.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on handling RS headers and date settings.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
RMX010
Run schedule header &1 (client &2/plant &3) has to be postprocessed
What causes this issue? Run schedule header &V1& lies completely in the future. However, postings have already been carried out for it. &...
RMX006
End of processing in client &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMX012
Run schedule header &1 (client &2/plant &3) was converted
What causes this issue? The run schedule header &V1& is the current valid run schedule header. The corresponding production version takes ove...
RMX050
Client &1: Inspection lot &2 of RS header &3 not yet closed
What causes this issue? Client &V1& : Inspection lot &V2& of run schedule header &V3& is not yet closed.System Response The ...
Click on this link to search all SAP messages.