How To Fix RM826 - A maximum of six activity parameters possible


RM826 - Overview

  • Message type: E = Error

  • Message class: RM - Messages for Repetitive Manufacturing

  • Message number: 826

  • Message text: A maximum of six activity parameters possible

  • Show details Hide details
  • What causes this issue?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    A maximum of six standard value parameters can be maintained for one
    work center.

    How to fix this error?


    Error message extract from SAP system. Copyright SAP SE.


RM826 - Details

  • The SAP error message RM826, which states "A maximum of six activity parameters possible," typically occurs in the context of SAP's Project System (PS) or when dealing with activity management in various modules. This error indicates that you are trying to assign more than six parameters to an activity, which exceeds the system's limit.
    
    Cause: The primary cause of this error is that the system restricts the number of activity parameters that can be assigned to a single activity to a maximum of six. This limitation is in place to ensure system performance and maintainability.
    Solution: To resolve this error, you can take the following steps: Review Activity Parameters: Check the activity you are trying to create or modify. Identify the parameters you have assigned to it. Reduce Parameters: If you have more than six parameters assigned, you will need to remove some. Evaluate which parameters are essential for your activity and remove any that are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


RM826 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author