Do you have any question about this error?
Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 415
Message text: Reporting point confirmation only possible with kanban
You have attempted to post a reporting point confirmation within the
repetitive manufacturing confirmation function although you have
specified in the repetitive manufacturing profile that reporting point
confirmation may be carried out via Kanban only.
The confirmation cannot be carried out.
With the current repetitive manufacturing profile, you can carry out the
reporting point confirmation using the confirmation functions in Kanban
only. You have two options:
In the Kanban menu, choose <ZK>Control -> Confirm.</>
Set the status of the kanban to "Full" in the demand source (consumer)
view on the kanban board.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you nevertheless wish to post the reporting point confirmationError message extract from SAP system. Copyright SAP SE.
RM415
- Reporting point confirmation only possible with kanban ?The SAP error message RM415 ("Reporting point confirmation only possible with kanban") typically occurs in the context of production and inventory management when trying to confirm a production order or a process order that is not set up to use the Kanban method. This error indicates that the system expects a Kanban setup for reporting point confirmations, which is a specific method used in lean manufacturing to manage inventory and production flow.
Cause:
- Configuration Issue: The production order or process order is not configured to use Kanban, but the system is trying to perform a confirmation that requires it.
- Incorrect Confirmation Type: The type of confirmation being attempted is not compatible with the order type or the settings in the system.
- Missing Kanban Setup: The necessary Kanban control cycle or settings may not be defined in the system for the material or production process being used.
Solution:
- Check Order Type: Ensure that the order type you are trying to confirm is set up to allow for Kanban confirmations. If it is not, you may need to change the order type or adjust the settings.
- Review Kanban Configuration: Verify that the Kanban control cycle is properly configured for the materials involved. This includes checking the Kanban settings in the material master and ensuring that the control cycle is active.
- Use Correct Confirmation Method: If Kanban is not intended to be used, ensure that you are using the correct confirmation method for the order type. You may need to switch to a standard confirmation process instead of a Kanban-based one.
- Consult Documentation: Review SAP documentation or consult with your SAP support team to understand the specific configuration settings required for your scenario.
Related Information:
If the issue persists after checking these areas, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP PP (Production Planning) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
RM414
No product cost collector selected: mat. &, plant &, version &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM413
Error reading RP data: mat. &, plant &, version &, prod.cost coll. &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM416
Reporting point confirmation not allowed with kanban
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM417
Carry out reporting point confirmation in kanban
What causes this issue? You have set the <ZK>Reporting Point Confirmation with Kanban and Manual Posting </>indicator in the repetitive m...
Click on this link to search all SAP messages.