Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 389
Message text: WM staging for split individual requirement & & not possible
The individual requirement with reservation number &V1&, item &V2& was
split in the pull list or was modified in the database in background
mode.
<ZH>1st instance: splitting</>
WM staging can only be carried out for individual requirements that
have not yet been split into partial quantities. Splitting can have
been carried out for one of the following reasons:
You specifically accessed the function <LS>Splitting</> for a
collective requirement, for example, to split a quantity to certain
batches.
You have determined replenishment quantities from several replenishment
sources.
When assigning replenishment quantities to requirement quantities, the
system divides the individual requirements to be able to display the
assignment of replenishment quantities to requirements quantities in
the details display.
<ZH>2nd instance: reservation modified in the background</>
The requirement quantity of the dependent requirement is modified on
the database at the same time as the procesing of the pull list.
In these instances, no WM staging of materials can be carried out for
the requirement.
<ZH>In the 1st instance:</>
Requirements for a WM staging should not be processed using the
splitting function.
If an MM stock transfer and a WM staging should coincide, you should
execute the MM stock transfer first before executing the WM staging.
When executing the MM stock transfer;
the replenishment quantities displayed are reset again
individual requirements that were split into partial quantities
according to replenishment source are grouped together again
a WM provision can be carried out
<ZH>In the 2nd instance:</>
Material can only be staged for this requirement when the <LS>pull
list</> is accessed again.
Error message extract from SAP system. Copyright SAP SE.
RM389
- WM staging for split individual requirement & & not possible ?The SAP error message RM389, which states "WM staging for split individual requirement & & not possible," typically occurs in the context of Warehouse Management (WM) when there is an issue with staging materials for a split individual requirement. This error can arise in various scenarios, particularly when dealing with split deliveries or when the system is unable to fulfill a requirement due to certain constraints. Causes of RM389 Error Insufficient Stock: There may not be enough stock available in the warehouse to fulfill the split requirement.
Configuration Issues: The warehouse management configuration may not be set up correctly to handle split requirements. Batch Management: If batch management is enabled, there may be issues with batch determination or availability. Storage Location Issues: The storage location may not have the necessary stock or may not be configured to allow staging for the split requirement. Delivery Split: If the delivery is split into multiple parts, the system may
Get instant SAP help. Sign up for our Free Essentials Plan.
RM388
& individual reqmts were processed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM386
No replenishment source could be determined
What causes this issue? No storage location could be found that could be used as the replenishment storage location for the components.System Respons...
RM390
WM staging of picking parts not possible
What causes this issue? You accessed the pull list using a selection type which reexplodes the bill of materials of the selected orders. In this case...
RM391
Reservation & could not be blocked: no WM material staging
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.