Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 140
Message text: No preliminary costing possible with nonvaluated make-to-order production
No preliminary costing can be found for a product cost collector.
You want to carry out a backflush for unvaluated make-to-order stock
and, at the same time, the REM profile is set so that activity postings
are carried out on the basis of the preliminary costing for the product
cost collector. However, no product cost collector exists for
unvaluated make-to-order stock.
The system cannot determine any preliminary costing for a product cost
collector and therefore cannot carry out the activity backflush.
The process you set for unvaluated make-to-order stock is not
compatible with the settings for the activity backflush in the REM
profile.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
RM140
- No preliminary costing possible with nonvaluated make-to-order production ?The SAP error message RM140 "No preliminary costing possible with nonvaluated make-to-order production" typically occurs in the context of production planning and costing in SAP, particularly when dealing with make-to-order (MTO) production scenarios. This error indicates that the system cannot perform preliminary costing for a production order that is set up as non-valuated.
Cause: Non-Valuated Stock: The production order is set up for non-valuated stock, meaning that the system does not track the value of the stock. This is common in certain scenarios where the focus is on quantity rather than value. Costing Variant Settings: The costing variant used may not be configured to handle non-valuated production orders. Missing Master Data: There may be missing or incorrect master data related to the material, such as the valuation class or costing information. Order Type Configuration: The order type used for the production order may not be configured to allow preliminary costing.
Solution: Check Order Type Configuration: Ensure that
Get instant SAP help. Sign up for our Free Essentials Plan.
RM139
Error creating the planned order
What causes this issue? When reversing a backflush, an error occurred when creating the planned order.System Response This error should not occur.Ho...
RM138
No planned orders exist for sales order & and item &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM141
Max. 98 production versions are allowed for costing per prod. version
What causes this issue? When carrying out costing per production version, a maximum of 98 different production versions per material and plant are po...
RM142
Error inserting the link between prod.version and cost estimate
What causes this issue? An error occurred when inserting an entry in the table for linking production version and costing version (T437l). The system...
Click on this link to search all SAP messages.