Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 130
Message text: Please enter material and/or planned order
You did not enter sufficient selection criteria.
Depending on the access, you must enter a material number and/or a
planned order number so that the system can carry out a selection.
Enter a material number and/or a planned order number.
Error message extract from SAP system. Copyright SAP SE.
RM130
- Please enter material and/or planned order ?The SAP error message RM130 ("Please enter material and/or planned order") typically occurs in the context of production planning or material management when the system expects a material number or planned order to be specified, but it is missing or incorrectly entered.
Cause: Missing Input: The user did not enter a material number or planned order in the relevant field. Incorrect Input: The entered material number or planned order does not exist in the system or is not valid for the operation being performed. Authorization Issues: The user may not have the necessary authorizations to view or access the material or planned order. System Configuration: There may be issues with the configuration of the material master or planned order settings in the system.
Solution: Check Input Fields: Ensure that you have entered a valid material number or planned order in the appropriate fields. Double-check for typos or incorrect entries. Material Master: Verify that the material number exists in
Get instant SAP help. Sign up for our Free Essentials Plan.
RM129
Please enter a material
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM128
Planned order &1 not allowed for make-to-order production
What causes this issue? You want to carry out a backflush for a planned order. The planned order you entered is not allowed for make-to-order product...
RM131
Planned order & is a planned order for preplanning
What causes this issue? You want to carry out a backflush for the planned order. However, the planned order you entered is a planned order for <DS...
RM132
Planned order & is only allowed for make-to-order production
What causes this issue? You want to carry out a backflush for a planned order. However, the planned order you entered is only allowed for the procedu...
Click on this link to search all SAP messages.