Do you have any question about this error?
Message type: E = Error
Message class: RK - Messages for Parallel Processing
Message number: 008
Message text: Too many errors in parallel processing
In parallel processing for server group &v1&, communication errors to
all instances have occurred. No more instances are available.
Parallel processing is terminated.
Check whether the RFC link to server group &v1& is functioning
properly.
Error message extract from SAP system. Copyright SAP SE.
RK008
- Too many errors in parallel processing ?The SAP error message RK008, which states "Too many errors in parallel processing," typically occurs when there are issues during the execution of parallel processing tasks in SAP. This can happen in various scenarios, such as during batch processing, data uploads, or when executing reports that utilize parallel processing.
Causes:
- Excessive Errors: The most common cause is that the number of errors encountered during the parallel processing exceeds the system's configured threshold.
- Data Issues: There may be issues with the data being processed, such as invalid entries, missing data, or data that does not meet the required format.
- Configuration Settings: The system may be configured to allow only a limited number of errors before it stops processing.
- Resource Limitations: Insufficient system resources (like memory or processing power) can lead to failures in processing tasks in parallel.
- Locking Issues: If multiple processes are trying to access the same data simultaneously, it can lead to locking issues and subsequent errors.
Solutions:
- Review Error Logs: Check the detailed error logs to identify the specific errors that are causing the issue. This can help in pinpointing the root cause.
- Data Validation: Ensure that the data being processed is valid and meets all necessary criteria. Clean up any erroneous data entries.
- Adjust Configuration: If applicable, consider adjusting the configuration settings related to error handling in parallel processing. This may involve increasing the threshold for allowable errors.
- Resource Allocation: Ensure that the system has adequate resources (CPU, memory) to handle the parallel processing tasks. You may need to optimize the system or schedule jobs during off-peak hours.
- Sequential Processing: If parallel processing continues to cause issues, consider switching to sequential processing for the affected tasks, at least temporarily, to avoid overwhelming the system.
- Consult SAP Notes: Check for any relevant SAP Notes or updates that may address known issues related to parallel processing and the RK008 error.
Related Information:
By following these steps, you should be able to diagnose and resolve the RK008 error effectively.
Get instant SAP help. Start your 7-day free trial now.
RK007
Error in initialization of parallel processing (see long text)
What causes this issue? A technical error occurred during the initialization of parallel processing. &TECHNICAL-INFO& Local host: &V1&...
RK006
Error in parallel processing (see long text)
What causes this issue? An error occurred during parallel processing. &TECHNICAL-INFO& Local host: &V1& RFC destination: &V2&...
RK020
Parallel processing has been started with &1 work processes
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RK021
Parallel Processing has been completed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.