Do you have any question about this error?
Message type: E = Error
Message class: RI - Projects: commercial reporting
Message number: 109
Message text: No operating concern has been assigned to controlling area &
The project/WBS element &V2& is assigned to controlling area &V1&.
However, controlling area &V1& is not assigned to an operating concern.
The checks could not be made.
Assign controlling area &V1& to an operating concern, or make the
checks omitting the settlement rule check.
Error message extract from SAP system. Copyright SAP SE.
RI109
- No operating concern has been assigned to controlling area & ?The SAP error message RI109 "No operating concern has been assigned to controlling area &" typically occurs in the context of SAP Controlling (CO) when there is an attempt to perform operations related to Profitability Analysis (CO-PA) without a proper configuration of the controlling area.
Cause:
This error arises when:
- The controlling area has not been assigned an operating concern in the system.
- The operating concern is necessary for Profitability Analysis, and without it, the system cannot process CO-PA related transactions.
- The configuration settings in the SAP system are incomplete or incorrect.
Solution:
To resolve the RI109 error, follow these steps:
Check Controlling Area Configuration:
- Go to the SAP Easy Access screen.
- Navigate to
SPRO
(SAP Project Reference Object) >Enterprise Structure
>Definition
>Controlling
>Define Controlling Area
.- Select the relevant controlling area and check if an operating concern is assigned.
Assign Operating Concern:
- If no operating concern is assigned, you need to assign one:
- Go to
SPRO
>Controlling
>Profitability Analysis
>Basic Settings
>Assign Operating Concern to Controlling Area
.- Select the controlling area and assign the appropriate operating concern.
Check Operating Concern Configuration:
- Ensure that the operating concern is properly configured for your business needs. This includes checking the characteristics and value fields that are defined for the operating concern.
Transport Requests:
- If changes were made in a development environment, ensure that the transport requests are moved to the production environment.
Testing:
- After making the necessary changes, test the functionality that was previously causing the error to ensure that it has been resolved.
Related Information:
Transaction Codes:
OKKP
- for controlling area configuration.KE52
- to display or change operating concern settings.Documentation:
User Roles:
Consulting SAP Notes:
By following these steps, you should be able to resolve the RI109 error and ensure that your SAP system is correctly configured for Profitability Analysis.
Get instant SAP help. Start your 7-day free trial now.
RI108
& checked: inconsistencies found
What causes this issue? &V1& was checked in accordance with the settings entered. Inconsistencies were found. There may also be information ...
RI107
& checked: errors found
What causes this issue? &V1& (and connected objects) was checked in accordance with the settings entered. Errors and inconsistencies were fo...
RI110
Checks complete -> see log
What causes this issue? The checks have been completed successfully. The result of the check is stored as a log.System Response The system issues a...
RI111
& & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...