Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: RI - Projects: commercial reporting
Message number: 109
Message text: No operating concern has been assigned to controlling area &
The project/WBS element &V2& is assigned to controlling area &V1&.
However, controlling area &V1& is not assigned to an operating concern.
The checks could not be made.
Assign controlling area &V1& to an operating concern, or make the
checks omitting the settlement rule check.
Error message extract from SAP system. Copyright SAP SE.
RI109
- No operating concern has been assigned to controlling area & ?The SAP error message RI109 "No operating concern has been assigned to controlling area &" typically occurs in the context of SAP Controlling (CO) when there is an attempt to perform operations related to Profitability Analysis (CO-PA) without a proper configuration of the controlling area.
Cause:
This error arises when:
- The controlling area has not been assigned an operating concern in the system.
- The operating concern is necessary for Profitability Analysis, and without it, the system cannot process CO-PA related transactions.
- The configuration settings in the SAP system are incomplete or incorrect.
Solution:
To resolve the RI109 error, follow these steps:
Check Controlling Area Configuration:
- Go to the SAP Easy Access screen.
- Navigate to
SPRO
(SAP Project Reference Object) >Enterprise Structure
>Definition
>Controlling
>Define Controlling Area
.- Select the relevant controlling area and check if an operating concern is assigned.
Assign Operating Concern:
- If no operating concern is assigned, you need to assign one:
- Go to
SPRO
>Controlling
>Profitability Analysis
>Basic Settings
>Assign Operating Concern to Controlling Area
.- Select the controlling area and assign the appropriate operating concern.
Check Operating Concern Configuration:
- Ensure that the operating concern is properly configured for your business needs. This includes checking the characteristics and value fields that are defined for the operating concern.
Transport Requests:
- If changes were made in a development environment, ensure that the transport requests are moved to the production environment.
Testing:
- After making the necessary changes, test the functionality that was previously causing the error to ensure that it has been resolved.
Related Information:
Transaction Codes:
OKKP
- for controlling area configuration.KE52
- to display or change operating concern settings.Documentation:
User Roles:
Consulting SAP Notes:
By following these steps, you should be able to resolve the RI109 error and ensure that your SAP system is correctly configured for Profitability Analysis.
Get instant SAP help. Sign up for our Free Essentials Plan.
RI108
& checked: inconsistencies found
What causes this issue? &V1& was checked in accordance with the settings entered. Inconsistencies were found. There may also be information ...
RI107
& checked: errors found
What causes this issue? &V1& (and connected objects) was checked in accordance with the settings entered. Errors and inconsistencies were fo...
RI110
Checks complete -> see log
What causes this issue? The checks have been completed successfully. The result of the check is stored as a log.System Response The system issues a...
RI111
& & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.