How To Fix REXCPTPT217 - Construction date must be set before the exemption status


REXCPTPT217 - Overview

  • Message type: E = Error

  • Message class: REXCPTPT -

  • Message number: 217

  • Message text: Construction date must be set before the exemption status

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message REXCPTPT217 - Construction date must be set before the exemption status ?
    The SAP error message REXCPTPT217, which states "Construction date must be set before the exemption status," typically occurs in the context of managing construction projects or assets within the SAP system, particularly in modules related to real estate or asset management.
    
    Cause: This error arises when the system detects that the exemption status of a construction project or asset is being set or modified without a valid construction date being specified. The construction date is crucial because it establishes the timeline for the project, and the exemption status may depend on this date for compliance or reporting purposes.
    Solution: To resolve this error, you should follow these steps: Set the Construction Date: Navigate to the relevant transaction or screen where you are managing the construction project or asset. Ensure that you have entered a valid construction date before attempting to set or change the exemption status. Check Data Entry: Verify that the construction date is in the correct format

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author