How To Fix RESCAJ015 - &1: maximum costs &2 considered - costs &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RESCAJ - Adjustment for Conditions of SCS

  • Message number: 015

  • Message text: &1: maximum costs &2 considered - costs &3

  • Show details Hide details
  • What causes this issue?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    How to fix this error?

    Procedure for System Administrators

    INCLUDE REFX_CA_PROT_CUST_MESSAGE OBJECT DOKU ID TX

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RESCAJ015 - &1: maximum costs &2 considered - costs &3 ?

    The SAP error message RESCAJ015 typically relates to cost planning in the context of project management or controlling within SAP. This error indicates that the maximum costs specified for a certain operation or project have been exceeded, and it provides details about the costs involved.

    Cause:

    The error message RESCAJ015 is triggered when the total costs for a project or operation exceed the predefined maximum limit set in the system. This can happen due to various reasons, such as:

    1. Incorrect Cost Estimates: The cost estimates for resources or activities may have been entered incorrectly, leading to an overestimation of costs.
    2. Changes in Project Scope: If the scope of the project has changed, additional costs may have been incurred that were not accounted for in the original planning.
    3. Resource Allocation Issues: Inefficient allocation of resources or unexpected resource usage can lead to higher costs.
    4. Configuration Settings: The maximum cost limits may be set too low in the configuration settings of the project or cost center.

    Solution:

    To resolve the RESCAJ015 error, you can take the following steps:

    1. Review Cost Estimates: Check the cost estimates for the project or operation to ensure they are accurate and reflect the current situation.
    2. Adjust Maximum Costs: If the maximum costs are set too low, consider adjusting these limits in the configuration settings to accommodate the actual costs.
    3. Analyze Project Scope: Review any changes in the project scope that may have led to increased costs and adjust the planning accordingly.
    4. Resource Management: Ensure that resources are being allocated efficiently and that any unexpected usage is addressed.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing costs and resolving related errors.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CJI3 (Project Actual Cost Line Items) to analyze project costs.
    • Cost Planning: Understand the cost planning process in SAP, including how to set and adjust maximum costs for projects.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles: Ensure that you have the appropriate permissions to make changes to cost estimates and project settings.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project management or controlling within SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author