Do you have any question about this error?
Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 238
Message text: The period "Shift" cannot be expanded (smallest period)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
REMPT238
- The period "Shift" cannot be expanded (smallest period) ?The SAP error message REMPT238, which states "The period 'Shift' cannot be expanded (smallest period)," typically occurs in the context of SAP's Production Planning (PP) or Capacity Planning modules. This error indicates that the system is unable to expand a specific period (in this case, a shift) into smaller time intervals because it has reached the smallest defined period for that particular planning scenario.
Cause:
- Period Definition: The shift period is defined in such a way that it cannot be broken down further. For example, if the shift is defined as a full day, the system cannot expand it into hours or minutes.
- Configuration Settings: The configuration settings for the planning periods may not allow for further breakdown. This could be due to settings in the planning strategy or the way the work center is defined.
- Data Entry Issues: There may be issues with the data entered for the planning period, such as incorrect dates or times that do not align with the defined periods.
Solution:
- Check Period Definitions: Review the definitions of the periods in the configuration settings. Ensure that the shift period is defined correctly and that it allows for the desired level of granularity.
- Adjust Planning Parameters: If necessary, adjust the planning parameters in the configuration to allow for smaller periods. This may involve changing the settings in the work center or the planning strategy.
- Review Work Center Settings: Check the work center settings to ensure that the shift definitions are appropriate for the production process. Make sure that the shift definitions align with the production schedule.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on configuring periods and shifts in your version of SAP.
- Testing: After making changes, test the configuration to ensure that the error no longer occurs and that the system behaves as expected.
Related Information:
CR01
(Create Work Center), CR02
(Change Work Center), or OPKP
(Define Planning Periods) to access the relevant configuration settings.If the problem persists after trying the above solutions, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
REMPT237
The period "Month" cannot be expanded (already the largest period)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
REMPT235
Only possible to print list with period, shift or day
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
REMPT239
Only months are displayed in the user-defined period split
What causes this issue? You set the user-defined period split in such a way that neither shifts, days or weeks are displayed.System Response The sys...
REMPT240
No planning calendar can be selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.