How To Fix REMCCA018 - &1: time slot starting from &2 was changed as follows


SAP Error Message - Details

  • Message type: E = Error

  • Message class: REMCCA - Messages for Higher-Leevel Mass Change

  • Message number: 018

  • Message text: &1: time slot starting from &2 was changed as follows

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message REMCCA018 - &1: time slot starting from &2 was changed as follows ?

    The SAP error message REMCCA018 typically relates to the Capacity Planning and Production Planning modules within SAP, particularly in the context of the Advanced Planning and Optimization (APO) or the Production Planning (PP) module. This message indicates that a time slot for a production order or a planned order has been altered, which can affect scheduling and resource allocation.

    Cause:

    The error message REMCCA018 is triggered when there is a change in the scheduling of a time slot for a production order. This can happen due to several reasons, including:

    1. Resource Availability: Changes in the availability of resources (machines, labor, etc.) can lead to adjustments in the planned time slots.
    2. Order Prioritization: If other orders are prioritized, it may cause a shift in the scheduling of the current order.
    3. Capacity Constraints: If there are capacity constraints that were not accounted for initially, the system may need to adjust the time slots to accommodate these constraints.
    4. Changes in Demand: Fluctuations in demand can lead to changes in production schedules, affecting the time slots of existing orders.

    Solution:

    To resolve the issue indicated by the REMCCA018 message, consider the following steps:

    1. Review the Scheduling: Check the scheduling of the affected order and see if there are any conflicts or constraints that need to be addressed.
    2. Adjust Resource Allocation: Ensure that the resources required for the production order are available and properly allocated.
    3. Re-evaluate Capacity Planning: Look into the capacity planning settings to ensure that they align with the current production requirements.
    4. Check for Dependencies: Investigate if there are any dependencies with other orders that might be causing the time slot change.
    5. Consult Logs: Review the system logs for any additional information or warnings that might provide context for the change.
    6. Communicate with Stakeholders: If the change affects other departments (like sales or logistics), communicate with them to manage expectations and adjust plans accordingly.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD04 (Stock/Requirements List), COHV (Mass Processing of Production Orders), and others that can help you analyze the situation.
    • SAP Notes: Check for any SAP Notes related to this error message for specific patches or updates that may address known issues.
    • Documentation: Review SAP documentation on capacity planning and production scheduling for best practices and troubleshooting tips.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP production planning and scheduling.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker