How To Fix REEXCO120 - Planning not possible for cost element &1


REEXCO120 - Overview

  • Message type: E = Error

  • Message class: REEXCO - Messages for CO Integration

  • Message number: 120

  • Message text: Planning not possible for cost element &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message REEXCO120 - Planning not possible for cost element &1 ?
    The SAP error message REEXCO120, which states "Planning not possible for cost element &1," typically occurs in the context of cost planning in SAP Controlling (CO). This error indicates that the system is unable to perform planning activities for a specific cost element due to various reasons. Here are some common causes, potential solutions, and related information:
    Causes:
    
    
    Cost Element Not Defined for Planning: The cost element may not be set up for planning in the system. This can happen if the cost element is not marked as a planning cost element in the configuration.
    
    
    Planning Version Issues: The planning version being used may not be valid for the cost element. If the version is not activated or is not set up correctly, planning will not be possible.
    
    
    Cost Element Type: The type of cost element (primary or secondary) may not be suitable for planning. For example, secondary cost elements are typically used for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author