How To Fix REBDAO023 - Final inspection has to be after the completion date


REBDAO023 - Overview

  • Message type: E = Error

  • Message class: REBDAO -

  • Message number: 023

  • Message text: Final inspection has to be after the completion date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message REBDAO023 - Final inspection has to be after the completion date ?
    The SAP error message REBDAO023, which states "Final inspection has to be after the completion date," typically occurs in the context of quality management and production processes. This error indicates that the system is enforcing a rule that the final inspection of a product must occur after the completion date of the production order or process. Here’s a breakdown of the cause, potential solutions, and related information:
    
    Cause: Order Completion Date: The completion date of the production order is set, and the system is checking that the final inspection date is after this completion date. Incorrect Date Entry: The final inspection date may have been entered incorrectly, either manually or through a system process. Process Flow Issues: There may be issues in the process flow where the final inspection is being scheduled or recorded before the actual completion of the production order. Solutions: Check Dates: Verify the completion date of the production order and ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker